This site requires JavaScript to be enabled

Research: Internal Approval Form (IAF) - IAF Data Entry - Refreshing a Budget

867 views

3.0 - Updated on 01-31-2024 by Wendy Peck (wly2)

2.0 - Updated on 11-21-2023 by Sarah Dyer (sls376)

1.0 - Authored on 07-19-2021 by Kameron Dangleben (kxd337)

Article Intended For

All University faculty, staff, researchers with permission to use and/or access Penn State Research Information Systems.

Introduction

This article goes over the process of refreshing a budget.

Article Body

 

IAF Data Entry - Refreshing a Budget

IAF's can be created or updated from imported budget data in SIMSbudgets (this includes object code budgets and general ledger budgets). In the case where a budget has been updated, an AOR or DRA can "refresh" IAF from the "Basic Info", "Budget", and "Personnel" tabs by selecting  .

When data is "refreshed" you will have 2 options:

This Tab: This option will only update information for the tab you are editing.

All Tabs: This option will update fields on "Basic Information", "Budget, and "Personnel" tabs

The Budget Refresh Options Panel

The table below represents the data that is imported for each tab:

Basic Info
Budget
Personnel
TitleInitial StartAll personnel listed as Cat I on the budget *
PI NameInitial EndRole
SponsorInitial DirectPeriod Effort
Submitting UnitInitial F&A 
Administering UnitInitial Total (calculated) 
Type of SubmissionTotal Start 
Type of Project

Total End

 
 Total Direct 
 Total F&A 
 Total (calculated) 
 F&A 
 Location 
 Basis 
 Subcontracts 

* Refreshing Personnel:  Please note that when personnel are removed from the budget, and the personnel tab is refreshed, personnel are not removed from the IAF.  Refreshing the budget will update existing personnel, and add personnel, but will not remove personnel from the IAF.

Links