This site requires JavaScript to be enabled

Research: Internal Approval Form (IAF) - Building an Approval workflow

1477 views

2.0 - Updated on 02-06-2024 by Wendy Peck (wly2)

1.0 - Authored on 07-17-2021 by Kara Marshall (qum160)

Article Intended For

All University faculty, staff, researchers with permission to use and/or access Penn State Research Information Systems.

Introduction

This article examines the process of building a properly configured approval workflow.

Article Body

Building an Approval Workflow

A properly configured approval workflow consists of an AOR role (A), DH role (B), RD role (C), and CD role (D) unit entries.

As an example, an IAF must have an AOR assigned to the unit (or college). The department must have an assigned DH. In most cases, this is enough for the workflow approval to be completed. If an investigator listed on the IAF is an assigned DH, then a RD or CD must be assigned for the unit since a user cannot approve in two different roles. This is called approval escalation and requires the approval of a RD or CD. Please work with the unit AOR to properly configure an approval workflow.

Links