This site requires JavaScript to be enabled

Research: Internal Approval Form (IAF) - How to return an Award IAF to Proposal IAF

1563 views

3.0 - Updated on 01-19-2024 by Ashley Conte (akc5736)

2.0 - Updated on 11-21-2023 by Chris Lose (cdl1)

1.0 - Authored on 07-13-2021 by Kathy Butler (kvb5743)

Article Intended For

All university faculty, staff, and researchers with permission to use and/or access Penn State Research Information System - Internal Approval Form (IAF)

Introduction

This description describes the process of how to return an Award IAF to Proposal IAF.

Article Body

If an edit is required for an Award IAF, it may be required to return the IAF back to a Proposal IAF in order to change specific information.

The following fields are locked when a Proposal IAF transitions to an Award IAF:

PI Name, Submitting Department, Administering Department, Sponsor, Prime Sponsor, Type of Submission, Personnel, Waivers

Below are the steps needed to return an Award IAF to a Proposal IAF so edits can be made:

  1. If IAF has NOT been revised or returned from CPO
    1. Revise the IAF or ask the assigned CPO staff to use the Return to College for Revision activity in Negotiation Manager
  2. If IAF has been matched to a Negotiation Manager log record
    1. Contact assigned CPO staff and ask them to remove the OSP# reference from the Negotiation Manager log record (the Return to Proposal button will NOT appear until this is completed)
  3. From the Home menu in the IAF, press the button to the far right of the row of the Action Required tab
    1. Note that this action returns the IAF data back to the Proposal stage
  4. From the Home tab, search for the OSP#
  5. Press the  button
    1. Note that the IAF Process Map should now show Proposal Pre-Workflow/Recalled
  6. Complete the needed IAF edits
  7. Press the  button
  8. If step 2 was needed, contact assigned CPO staff so the OSP# can be re-entered on the Negotiation Manager log record

For more information, please contact simsadmin@psu.edu 

Links